Skip to content
Logo DOSMAS GRUPDOSMAS GRUP
DEMOLITION IN SANTA PONÇA
DOSMAS GRUP

DEMOLITION IN SANTA PONÇA

Demolitions · Santa Ponça, Calvia · 2025

Demolitions

DEMOLITION IN SANTA PONÇA

Santa Ponça, Calvia · 2025

DOSMAS GRUP carried out the complete demolition of a house located in front of the Illes Malgrats, in the municipality of Calvià, as an initial phase for the construction of an exclusive single-family residence. The work was carried out with specialized machinery and strict safety protocols, guaranteeing efficient removal of structures and waste.

This action paves the way for a high-end project that, thanks to its privileged location with panoramic views and quick access to Palma and the airport, redefines the concept of luxury housing in the area. With this intervention, DOSMAS GRUP once again demonstrates its ability to accurately and reliably address the previous stages of large residential constructions.

Demolished surface

1.250 m²

Managed waste

2.900 t

Duration

7 weeks

Incidents

0

DEMOLITION IN SANTA PONÇA

Case study

Challenge
Demolish in a sensitive and high residential value environment with risk control and strict waste management.
Solution
Specific demolition plan with dismantling phases, segregation of materials and scheduled removal logistics.
Execution
The demolition was carried out with specialized machinery and reinforced security protocols at each stage.
Result
Plot released and prepared for new construction, complying with regulations and deadline objectives.

Need a similar project?

Request quote
DEMOLITION IN SANTA PONÇA 1
01 / 12
DEMOLITION IN SANTA PONÇA | DOSMAS GRUP